Redevelopment of
Cooperative Housing Society

DUTIES AND FUNCTIONS OF THE Developer

1. The
Developer to demolish the building existing in the plot and construct new multi storied buildings taking into account the earthquake resistant factors as directed by The Municipal Corporation of Greater Mumbai. The new building should have stilt for car parking and should consist of _____ stories as per approved plans. The final plans are to be prepared after due consultation with the managing committee and understanding their requirements.

2. The
Developer shall be responsible to obtain all the necessary approvals from The Municipal Corporation of Greater Mumbai and all other statutory and Government offices and departments which will include:

1.Development Planning Remark or Town Planning Remark:

MCGM (Dev. Dept.)

2. Survey of the entire plot with regards to the area and topography of the plot, existing plot boundary and existing structures (
Developer’s Architect)

3.Intimation of Disapproval (IOD): MCGM

4.Property Tax Assessment NOC: MCGM (Assessment Department)

5.Hydraulic Engineer No Objection Certificate: MCGM (Hydraulic

Department)

6.Storm Water Drainage No Objection Certificate: MCGM

7.Sewerage No Objection Certificate: MCGM

8.Traffic Deptt. of Municipal Corporation of Greater Mumbai No

Objection Certificate: MCGM

9.Urban Land Ceiling NOC: Competent Authority in Collector's

Office

10. Tree No Objection Certificate: MCGM (Tree Authority)

11.Non-Agricultural Permission: Collector's Office

12.Civil Aviation No Objection Certificate: Airport Authority of India

13.Pest Control No Objection Certificate: MCGM (PCO)

14.MTNL No Objection Certificate: MTNL

15.Chief Fire Officer's No Objection Certificate: Fire Department

Office

16.Commencement Certificate: MCGM

17. Lift Inspection No Objection Certificate:Inspector of Lifts, PW

18. Occupation Certificate (OC):MCGM

19.Water Connection Certificate under section 270A:MCGM

20.Drainage Completion Certificate:MCGM (Water Department)

21.Building Completion Certificate (BCC):MCGM

22.TDR Loading:MCGM

23.Building Demolition Work:Contractor appointed for demolition

work

24.Soil Testing Report:The Concerned Laboratory

Please ensure to collect all the listed certificates from the
Developer/Developer as the same must be with the custody of the Housing Society once the Redevelopment of the property is completed and the occupancy certificate is issued by MCGM to rehouse the members.

3. The
Developer should provide the following infrastructure after the completion of the re-development work:

a. Complete paving around the building finished with suitable materials

b. Storm Water Drain

c. Sewerage lines

d. Security arrangements

e. Garden and landscaping (wherever possible)

f. Pipe gas line (as per availability)

g. Internet facility (as per availability)

h.
Society office

i. Adequate car parking spaces

Read More